WEPCO Addition
Project Type:
Design/Build
Project Summary:
7,333 S.F. Addition to Existing Facility
Project Manager/Engineer:
Bryan Balicki, P.E.
Lead Designer:
Christopher Shea
Construction Supervisor:
Tristan Kiendzior, L.C.S.
Project Description:
Sage Engineering and Contracting, Inc. Has permitted and will construct a 7,333 S.F. addition to the existing facility in Westfield, MA. It is to be a pre-engineered metal building with typical site improvements such as drainage, parking, lighting & landscaping.
Client:
Westfield Electroplating, Inc.
Location:
Westfield, MA
Design and Permitting:
March 2012 to August 2012
Construction Date:
August 2012 to Present