NES Worldwide
Project Type:
Design / Build Project
Project Summary:
New 39,160 S.F. Office & Manufacturing Facility
Project Manager/Engineer:
Frank A. DeMarinis, P.E.
Lead Designer:
Frank A. DeMarinis, P.E.
Construction Supervisor:
Tristan P. Kiendzior, L.C.S.
Project Description:
Sage Engineering designed, permitted and constructed a 39,160 S.F. manufacturing and office facility with a second floor break room and storage area. This project included typical site improvements, a paved parking lot with 38 spaces, dual loading docks, wash bay and storm water management system.
Client:
Stelwagon Realty Group
Location:
Westfield, MA
Design and Permitting:
March 2005 to June 2005
Construction Date:
June 2005 to December 2005