Chapdelain Bridge Repair
Project Type:
Design & Permitting
Project Summary:
Design a replacement bridge deck
Lead Designer:
Bryan J. Balicki, P.E.
Project Description:
Sage Engineering was contracted to complete the structural engineering and design of a replacement bridge deck. The existing bridge structure had become severely rotted over time. The bridge is a steel sub structure with a wooden deck spanning approximately 24 feet. The bridge design was completed last month and installed this month.
Client:
A. Crane Construction Co.
Location:
South Hadley, MA
Design and Permitting:
June 2013 - August 2013