Sandisfield Bridge Repair
Project Type:
Construction
Project Summary:
Replacement of Access Bridge to Residence
Project Manager/Engineer:
Frank A. DeMarinis, P.E.
Construction Supervisor:
Tristan Kiendzior, L.C.S.
Project Description:
We provided all Structural Engineering for the new bridge to support H 15-44 Loading ( 30,000 lb truck) and Construction of the primary structure and wooden deck.
Client:
Fran Shultz
Location:
10 Lower West Road Sandisfield, MA
Construction Date:
3 days to complete