Sandisfield Bridge Repair

Project Type: 
Construction
Project Summary: 
Replacement of Access Bridge to Residence
Project Manager/Engineer: 
Frank A. DeMarinis, P.E.
Construction Supervisor: 
Tristan Kiendzior, L.C.S.
Project Description: 
We provided all Structural Engineering for the new bridge to support H 15-44 Loading ( 30,000 lb truck) and Construction of the primary structure and wooden deck.
Client: 
Fran Shultz
Location: 
10 Lower West Road Sandisfield, MA
Construction Date: 
3 days to complete
Sandisfield Bridge Repair
Sandisfield Bridge Repair